We would like to talk about the processes of building the foundation of a house - where does the foundation begin and how we ensured its strength.
We began construction of the Palermo residential complex with tests. We described how this happened earlier in the LCD section. We have chosen the static indentation technology for the construction of the complex. Because:
- We took care of the residents, indentation is the absence of shocks, vibrations and harmful effects on the environment.
- We have chosen high accuracy of pile driving. The bearing capacity of the pile was evaluated already at the stage of its immersion.
- We ensured the safety of the pile heads due to the absence of shock effects.
- We have ensured high productivity. The IED processed hundreds of meters of piles during a work shift. Moreover, our piles are deepened 30 meters into the ground.
Prostir in Park Residence!
Park Residence
21.04.2021
More
Interesting facts about Park Residence
Park Residence
09.04.2021
More
Harmony between interior and exterior
Park Residence
05.04.2021
More
See all