Grillages and walls of the basement of the second section

Basement floor construction phase.
After all the piles have been pressed in, the stage of casting the grillages and walls of the basement begins.
Prostir in Park Residence!
Park Residence
21.04.2021
More
Interesting facts about Park Residence
Park Residence
09.04.2021
More
Harmony between interior and exterior
Park Residence
05.04.2021
More
See all